24 resultados para 120201 Building Construction Management and Project Planning

em QUB Research Portal - Research Directory and Institutional Repository for Queen's University Belfast


Relevância:

100.00% 100.00%

Publicador:

Resumo:

The Regional Cultural Centre in Letterkenny is a new 2000sqm arts center containing theatre, galleries, workshops and ancillary offices. The site is set back from the street, on high ground with good views. The form and envelope of the building was derived from geometrically connecting the site with the town’s two other main public buildings, the Cathedral (1901) and new Civic Offices (2002, also designed by MacGabhann Architects). This geometrical connection or vectors informed the geometry and shape of the building. This urban matrix of geometrically connecting three corner stones of society, namely the ecclesiastical headquarters, the administrative head quarters and the art centre helps to improve the town planning and urban design of the disparate and chaotic development that Letterkenny has become.
The large cantilever, which houses a 300sqm gallery, is aligned towards the Civic Offices, marks the entrance, and signifies a change of direction of the pedestrian route past the building, like a modern day obelisk.
The circulation routes and stairs internally provide views towards the civic offices and cathedral, thus reinforcing the connection between the three buildings and helps visitors make some sense of Letterkenny as an urban center. The main stairs and vertical circulation are contained behind the large glazed foyer, which is framed to be viewed externally like a proscenium stage, with visitors to the building passively acting their routes through the building.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Waste management and sustainability are two core underlying philosophies that the construction sector must acknowledge and implement; however, this can prove difficult and time consuming. To this end, the aim of this paper is to examine waste management strategies and the possible benefits, advantages and disadvantages to their introduction and use, while also to examine any inter-relationship with sustainability, particularly at the design stage. The purpose of this paper is to gather, examine and review published works and investigate factors which influence economic decisions at the design phase of a construction project. In addressing this aim, a three tiered sequential research approach is adopted; in-depth literature review, interviews/focus groups and qualitative analysis. The resulting data is analyzed, discussed, with potential conclusions identified; paying particular attention to implications for practice within architectural firms. This research is of importance, particularly to the architectural sector, as it can add to the industry’s understanding of the design process, while also considering the application and integration of waste management into the design procedure. Results indicate that the researched topic had many advantages but also had inherent disadvantages. It was found that the potential advantages outweighed disadvantages, but uptake within industry was still slow and that better promotion and their benefits to; sustainability, the environment, society and the industry were required.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Few studies to date have paid attention to relationship management when addressing performance problems. To bridge the knowledge gap, a questionnaire survey is conducted to analyze the impact of relationship management on project performance in construction. The analysis reveals that the deterioration of working relationships may increase the likelihood of poor performance. Poor performance can be effectively reduced by improving some aspects of working relationships. Collaborative working contributes to performance improvement, in which long-term collaboration is more effective than short-term collaboration. In addition to the questionnaire survey, a series of expert interviews provide a deeper insight into effective relationship management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

The aim of this paper is to identify the various managerial issues encountered by UK/Irish contractors in the management of materials in confined urban construction sites. Through extensive literature review, detailed interviews, case studies, cognitive mapping, causal loop diagrams, questionnaire survey and documenting severity indices, a comprehensive insight into the materials management concerns within a confined construction site environment is envisaged and portrayed. The leading issues highlighted are: that contractors’ material spatial requirements exceed available space, it is difficult to coordinate the storage of materials in line with the programme, location of the site entrance makes delivery of materials particularly difficult, it is difficult to store materials on-site due to the lack of space, and difficult to coordinate the storage requirements of the various sub-contractors. With the continued development of confined urban centres and the increasing high cost of materials, any marginal savings made on-site would translate into significant monetary savings at project completion. Such savings would give developers a distinct competitive advantage in this challenging economic climate. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of materials on a confined urban construction site becomes attainable.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Purpose: This paper investigates the link between two knowledge areas that have not been previously linked conceptually; stakeholder management and corporate culture. Focussing on the UK Construction Industry, the research study demonstrates mutual dependency of each of these areas on the other and establishes a theoretical framework with real potential to impact positively upon industry.

Design/methodology/approach: The study utilises both qualitative and quantitative data collection and then analysis to produce results contributing to the final framework. Semi-structured interviews were used and analysed through a cognitive mapping procedure. The result of this stage, set in the context of previous research, facilitated a questionnaire to be developed which helped gather quantitative values from a larger sample to enhance the final framework.

Findings: The data suggests that stakeholder management and corporate culture are key areas of an organisation’s success, and that this importance will only grow in future. A clearly identifiable relationship was established between the two theoretical areas and a framework developed and quantified.

Originality/value: It is evident that change is needed within the UK Construction Industry. Companies must employ ethical and social stakeholder management and manage their corporate culture like any other aspect of their business. Successfully doing this will lead to more successful projects, better reputation and survival. The findings of this project begin to show how change may occur and how companies might intentionally deploy advantageous configurations of corporate culture and stakeholder management.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This research assesses the effectiveness of current MSc. Construction Project Management programmes within the UK and Ireland. A review of published prospectuses is used to create questionnaires for universities, graduates and employers. Responses provide an insight into programme creation and their relative success in addressing the needs of industry and in achieving other educational objectives. Since the majority of learning institutions have attained professional accreditation, it is useful to review these awards and to assess their potential value to both graduates and industry alike. Interviews are conducted with representatives from the main professional accrediting bodies to understand their procedures and rigour in enforcing standards of education and training. The results show that project management education could be further enhanced by the inclusion of more practical learning and that current programmes place greater emphasis on hard skills at the expense of the softer human skills. There is clearly a need for a closer working relationship between academics and practitioners to tackle the perceived gap between theoretical learning and construction practice. Learning institutions can use the findings to improve their programmes and address the education deficiencies identified by the industry, by the professional institutions and by graduates.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Since the first launch of the new engineering contract (NEC) in 1993, early warning of problems has been widely recognized as an important approach of proactive management during a construction or engineering project. Is early warning really effective for the improvement of problem solving and project performance? This is a research question that still lacks a good answer. For this reason, an empirical investigation was made in the United Kingdom (U.K.) to answer the question. This study adopts a combination of literature review, expert interview, and questionnaire survey. Nearly 100 questionnaire responses were collected from the U.K. construction industry, based on which the use of early warning under different forms of contract is compared in this paper. Problem solving and project performance are further compared between the projects using early warning and the projects not using early warning. The comparison provides clear evidence for the significant effect of early warning on problem solving and project performance in terms of time, cost, and quality. Subsequently, an input-process-output model is developed in this paper to explore the relationship among early warning, problem solving, and project
performance. All these help construction researchers and practitioners to better understand the role of early warning in ensuring project success.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Increased complexity in large design and manufacturing organisations requires improvements at the operations management (OM)–applied service (AS) interface areas to improve project effectiveness. The aim of this paper is explore the role of Lean in improving the longitudinal efficiency of the OM–AS interface within a large aerospace organisation using Lean principles and boundary spanning theory. The methodology was an exploratory longitudinal case approach including exploratory interviews (n = 21), focus groups (n = 2), facilitated action-research workshops (n = 2) and two trials or experiments using longitudinal data involving both OM and AS personnel working at the interface. The findings draw upon Lean principles and boundary spanning theory to guide and interpret the findings. It was found that misinterpretation, and forced implementation, of OM-based Lean terminology and practice in the OM–AS interface space led to delays and misplaced resources. Rather both OM and AS staff were challenged to develop a cross boundary understanding of Lean-based boundary (knowledge) objects in interpreting OM requests. The longitudinal findings from the experiments showed that the development of Lean Performance measurements and lean Value Stream constructs was more successful when these Lean constructs were treated as boundary (knowledge) objects requiring transformation over time to orchestrate improved effectiveness and in leading to consistent terminology and understanding between the OM–AS boundary spanning team.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

This paper is concerned with the production and reproduction of segregation in Northern Ireland and how territoriality has impacted on the Protestant community in Derry/Londonderry. The city was pivotal in the development of the most recent conflict, has a majority Catholic population, sits on a contested border and has attempted to respond to expressions of alienation that have emerged from the Protestant community. The research used multiple methods to understand the nature of alienation and exclusion using secondary data, a quantitative household survey, in-depth interviews and focus
groups. This empirical commitment was important in identifying and unpacking the claims of various stakeholders with an interest in the use and development of the area. It is argued here that a version of Collaborative Planning provides a loosely articulated conceptual and methodological framework for drawing Protestant communities into the wider planning framework for the city. The data, however, suggest that the nature of stakeholders is complex and contradictory, and discursive practice that seeks consensus has limits, especially in validating or legitimating the assertions of self-acclaimed stakeholders. The research shows that the Protestant community had declined and residualised but had little experience of direct conflict with the majority community. Moreover, the Protestant community is now more likely to use the city centre (a predominantly Catholic space) for consumption and work, and its demographic decline has stopped. These findings are important as policy responses and community relations programmes have failed to distinguish between measurable socioeconomic needs and claims concerning ethnic alienation based on emotion and manipulation. Such alienation has tended to bolster single identity communities who have little or no prospect and/or knowledge of the collaborative efforts required to deliver meaningful regeneration. More realistic strategies based on agonism focus attention on power relations and the authenticity of positions adopted by competing interests in land use management and change. The paper concludes by highlighting the need to acknowledge and value contestation but to challenge sectarian discourses represented as legitimate claims about community needs and priorities.

Relevância:

100.00% 100.00%

Publicador:

Resumo:

Natural hazards trigger disasters, the scale of which is largely determined by vulnerability. Developing countries suffer the most from disasters due to various conditions of vulnerability which exist and there is an opportunity after disasters to take mitigative action. NGOs implementing post-disaster rehabilitation projects must be able to address the issues causing communities to live at risk of disaster and therefore must build dynamic capacity, capabilities and competencies, enabling them to operate in unstable environments. This research is built upon a theoretical framework of dynamic competency established by combining elements of disaster management, strategic management and project management theory. A number of NGOs which have implemented reconstruction and rehabilitation projects both in Sri Lanka following the Asian Tsunami and Bangladesh following Cyclone Sidr are being investigated in great depth using a causal mapping procedure. ‘Event’ specific maps have been developed for each organization in each disaster. This data will be analysed with a view to discovering the strategies which lead to vulnerability reduction in post-disaster communities and the competencies that NGOs must possess in order to achieve favourable outcomes. It is hypothesized that by building organizational capacity, capabilities and competencies to be dynamic in nature, while focusing on a more emergent strategic approach, with emphasis on adaptive capability and innovation, NGOs will be better equipped to contribute to sustainable community development through reconstruction. We believe that through this study it will be possible to glean a new understanding of social processes that emerge within community rehabilitation projects.